KONSEP NILAI HASIL (EARNED VALUE EVALUASI PENGENDALIAN WAKTU DAN BIAYA PADA PROYEK PENINGKATAN JALAN BOJONGSARI- MAJENANG KABUPATEN CILACAP DENGAN METODE KONSEP NILAI HASIL (EARNED VALUE CONCEPT)

Penulis

  • Mayang Sari Dewi Universitas Galuh Ciamis
  • Yanti Defiana Universitas Galuh
  • Uu Saepudin Universitas Galuh

DOI:

https://doi.org/10.25157/mediailmiahtekniksipil.v3i1.5509

Kata Kunci:

Earned Value Concept, Control Time , Control Cost

Abstrak

Evaluation control time And costs in the Project Improvement Road Bojongsari-Majenang with use method Earned Value Concept. Methods used​ in study This is descriptive quantitative, research that describes condition project certain with analysis of existing data. Data analysis using method analytical And descriptive . Analytical means the data has been There is processed such appearance so that produce results the end that can concluded . While descriptive It means is with to expose problems that have been There is or visible . Earned Value Concept study trend variants timetable And variants cost on something period time during project ongoing . Results study show that that Earned Value Concept can control time And cost on Project Improvement Road Bojongsari – Majenang Regency Cilacap. The average SPI value is less from 1, p. This show that control time on Project Improvement Road Bojongsari-Majenang Regency Cilacap not enough good, because No capable achieve the work targets that have been set planned . Average Value CPI not enough from 1, p. This show cost control on Project Improvement Road Bojongsari-Majenang Regency Cilacap is bad, because the costs incurred are greater if compared to the value obtained or in other words there is waste costs , but on Sunday final implementation work Project Improvement Road Bojongsari – Majenang Regency Cilacap finished appropriate time And cost incurred​ in accordance with planned budget .​

Diterbitkan

2026-02-02